How long does it take to install?
Our sheds take an average of 3 hours to install. This includes the construction and the shingling.

How should the site be prepared?
We can place the shed on a variety of bases (concrete, gravel, dirt or grass). If a concrete base is prepared, it must be square and level. If however the site is prepared with gravel or is just an area of grass, this spot should be fairly level. We use patio stones to do final leveling, but it is in the best interest of the customer to level the spot as close as possible.

How do you support the floor of the shed?
The floor is manufactured with treated floor joists at 2’ centers. We place patio stones under 3 points of each joist. For example, an 8X8 shed on a level spot would require 15 pieces of stone. This provides maximum stability for the garden shed.

What is the shed constructed of?
All the board lumber in the garden shed is eastern white pine. This includes the floor, walls and roof. Pine is very durable and weathers very well. We do not use chipboard, pressboard or plywood.

What do you treat the exterior with?
Some customers prefer to let the pine weather naturally, however the majority of people purchase the shed stained. We stain the exterior to complement the beauty of the shed and protect it from discolouring.

Can you install the sheds anywhere?
We have a lot of versatility with our construction method. We can easily get into most backyards or tight areas. A 3’ gate provides all the space we need to get to a site. We do however have to watch for overhead obstructions and obstacles on the ground.

How long do you have to wait to get a shed installed?
The average waiting period is 3 weeks. This can be longer in the spring and fall however we will do our best to meet your schedule.

Where do you deliver?
Our mill is located at St. Mary’s, Ontario and we deliver free of charge within 75 km. If you live outside of this area, please call to get a quote.